Antriksh Cloud

India's 500 MW Sovereign AI GPU Cloud

Building India's AI Infrastructure

Deep Tech

Investor Pitch Deck | 2025

Executive Summary

Building India's AI infrastructure leader at hyperscale

📊 The Opportunity

• $41.7B market opportunity
• India has 51x infrastructure gap vs US
• 48% AI adoption but only 1-4% of global investment

🚀 Our Solution

• 500MW liquid-cooled AI campus
• 288,000 GPUs (6x any competitor)
• Software-defined, 100% sovereign

💼 Business Model

• GPU-as-a-Service (60%)
• Sovereign cloud (25%)
• Venture engine (10%)

🏆 Competitive Edge

• 40-50% cost advantage
• 150-300kW per rack density
• Strategic canal-side location

📈 Financial Highlights

• 66% EBITDA margins
• $850M revenue by Year 5
• 2.4 year payback period

💰 Investment Ask

• $66M round in 3 Tranches
• 46% target IRR
• Revenue in 6-8 months

The Bottom Line

500MW secured • Govt backing • GB200 allocation • Ready to build
First-mover advantage to become India's AI infrastructure champion

India: Maximum Demand, Minimum Supply

$41.7B opportunity in India's AI infrastructure gap

🇮🇳

India

AI Adoption Rate
48%
DC per Million Users
1 MW
🇺🇸

USA

AI Adoption Rate
22%
DC per Million Users
51 MW
🇪🇺

EU

AI Adoption Rate
32%
DC per Million Users
28 MW

Critical Gap: India leads in AI adoption but has 51x less infrastructure than US, 28x less than EU

51x Gap = $41.7B

• 90%+ demand foreign
• India gets 1-4% investment
• GPU cloud 10x growth

2.2x
Higher AI adoption
100:1
US vs India invest
30%
Market CAGR

Solution: Liquid-Cooled Software-Defined AI GPU Data Center

Leapfrogging traditional DCs with 150kW+ per rack design (expandable to 300kW)

🏗️

500MW Scale

288K GPUs
6x any rival

💧

Liquid Cooled

150-300kW/rack
vs 20-30kW avg

🛡️

100% Sovereign

Data stays India
CERT-In ready

📍

Strategic Site

Canal water
5-30ms latency

Comparison Traditional DCs Antriksh Cloud
Rack Density 20-30kW (air-cooled) ✓ 150kW+ (liquid-cooled)
Infrastructure Hardware-defined ✓ Software-defined
Cooling Air-cooled, throttles ✓ Direct-to-chip liquid
AI Focus Mixed workloads ✓ 100% AI-only

Deploy in Seconds

from antriksh import GPU
cluster = GPU.create(
  region="delhi-1", 
  gpus=8, 
  type="GB200"
)
model = cluster.deploy("llama-70b")

Key Advantages:

✓ 15 min to first GPU
✓ Multi-cloud native
✓ Zero egress fees
✓ INR billing, 40% cheaper
✓ PUE < 1.10 efficiency

Why Now: Perfect Timing

Three mega-trends creating a $41.7B opportunity window

🌍

Global GPU Boom

10x
Growth
$500B
Capital

CoreWeave: $80B
Specialists win 80%

🇮🇳

India Ready

Max AI Adoption
National Priority Infra Status

Export ban lifted
Data sovereignty

📈

Market Gap

<50K
GPUs
$72M
E2E Val

No player >100MW
Wide open market

⚠️ The Investment Paradox

48%
AI Adoption
<1%
of Investment

Maximum demand + Minimum supply = Massive opportunity

🎯 Current Market Size in 2025

TAM
$757B
APAC
$227B
India
$41.7B
Target
$12.5B

🚀 The Window is Open NOW

First sovereign AI infrastructure player at scale wins the entire $41.7B market

Dual-Engine Business Model

Two synergistic engines driving exponential value creation

🏗️ Infrastructure Engine

Predictable Cash Flow

  • On-demand GPU cloud
  • Reserved instances
  • Managed private cloud
  • Sovereign SaaS hosting

Target: 85% contracted

Margin: 66% EBITDA

🚀 Venture Engine

Exponential Upside

  • GPU hours → equity
  • Portfolio 50+ startups
  • Strategic partnerships
  • Exit: 10-100x

Target: 10% capacity

Returns: 25-100x

Revenue Mix

60%

GPU-as-a-Service

60% discounted - hyperscalers

25%

Sovereign Cloud

3-5 yr contracts

10%

AI Ventures

Equity plays

"Infrastructure profits fund growth → Venture wins accelerate returns"

Superior Unit Economics

World-class efficiency meets India cost advantage

Per MW Economics

$34.4M*

CAPEX/MW

$16M

Revenue/MW

66%

EBITDA Margin

Cost Advantage Industry Avg Antriksh Advantage
Power Cost $0.12-0.15/kWh $0.08/kWh 47% Lower
Labor Cost US/EU baseline 67% Lower Major Win
Construction $40-50M/MW $34.4M/MW 23% Lower

Key Metrics

  • Payback: 2.4 years
  • Levered IRR: 65%
  • Break-even: 65% util
  • Target util: 85%

Density Edge

  • 576 GPUs per MW
  • 11.52 ExaFLOPS/MW
  • 150-300 kW per rack
  • 1.10 PUE efficiency

"Best ₹-per-FLOP in India"

* These cost are for Tier IV Design per MW of Total Energy Consumption by the Facility.

* The PoC ask for a 3MW Facility to make the site live is lesser. (Since Container based Rapid Deployment solution)

From Vision to Execution

Container-based PoC in 6-8 months, scaling to 500MW in 5 years

500MW
Power Secured
Canal Site
Water Access
$1.6B+
Team Track Record

Phased Execution Timeline

Phase 1
Container PoC
6-8 months

• 3MW capacity

• 1,728 GPUs

• Revenue starts

Phase 2
Scale Building
18 months

• 100MW building

• 57,600 GPUs

• Enterprise scale

Phase 3
Expansion
3 years

• 200-300MW

• Market leader

• Platform scale

Phase 4
Full Campus
5 years total

• 500MW complete

• 288,000 GPUs

• AI leader

1
2
3
4
Day 0 6-8 mo 18 mo 3 yr 5 yr

✓ Achieved

  • Govt MoU in final stages
  • Canal-side multi acre site locked
  • 500MW power inprinciple secured

🚀 Ready to Deploy

  • 3MW Container design
  • NVIDIA GB200 supply confirmed
  • 1.6Tbps fiber connectivity confirmed

Leadership Team

Deep expertise in AI Systems and Large Infrastructure projects

Abhigyan J Singh

Abhigyan J Singh

CEO & Founder

IIT-M EE • MS CS UB
5+ yrs AI systems

Anuraag J Singh

Anuraag J Singh

Director - Operations

32 yrs infrastructure
Large-scale project mgmt

Adesh Saini

Adesh Saini

Liaisoning Partner

50 yrs govt relations
Key state approvals

Dinesh K Saini

Dinesh K Saini

Director - Construction

Ex-Delhi Metro Director
$1.6B projects • IIT-R '81

Ken Moreano

Ken Moreano

Tech Partnership Lead

CEO Scott Data Center USA
20+ yrs data center ops
Under Negotiations

Proven Track Record of Mega-Project Delivery

$1.6B+

Infrastructure
Delivered

500MW

Power
Secured

100+ yrs

Infrastructure
Experience

5 Decades

Government
Relations

100%

On-Time
Delivery

Financial Projections

Based on phased rollout: 3MW → 100MW → 200MW → 500MW over 5 years

Revenue Growth Trajectory

$5M
Yr 1 (3MW)
$170M
Yr 2 (100MW)
$340M
Yr 3 (200MW)
$850M
Yr 5 (500MW)

44%

EBITDA Year 1

60%

EBITDA Year 5

$10B+

2030 Valuation

Metric Year 1 (3MW) Year 2 (100MW) Year 3 (200MW) Year 5 (500MW)
MW Live 3 (Container) 100 200 500
Revenue $5M $170M $340M $850M
EBITDA $2.2M $95M $204M $510M
EBITDA % 44% 56% 60% 60%
GPUs Live 1,728 57,600 115,200 288,000

Investment Opportunity: 3MW Phase 1 PoC

De-risked $66M seed round for 3MW proof-of-concept in progressive tranches

$66 Million

3MW Phase 1 PoC - 3 Progressive Tranches.
1.76 MW GPU IT Load (~24 Racks)

3MW PoC Capital Deployment

$6M
Tranche 1
$19M
Tranche 2
$41M
Tranche 3
9%
3MW Site Secured
29%
3MW Infra Ready
62%
3MW Operational

3MW

Phase 1 PoC

1,728

GB200 GPUs

Mo 6

Revenue Start

46%

Target IRR


* PoC Costs are lesser than full Tier IV Facility.
Assuing PuE of 1.7 for the PoC, 3MW / 1.7 = 1.76 MW of IT Load

Detailed 3MW PoC Milestones

Tranche 1: $6M - Regulatory & Site

Government & Regulatory:
• Final MoU with state government
• Environmental & pollution clearances
• Fire safety NOC
Site & Infrastructure:
• Land lease execution
• Soil testing & geotechnical survey
• Container layout design approval
Power & Connectivity:
• Power allocation letter
• Fiber connectivity agreement
Supply Chain:
• NVIDIA partner agreement
• GB200 allocation confirmation

Tranche 2: $19M - Infrastructure Build

Civil & Construction:
• Site grading & compaction
• Container pad foundations
• Access roads & security fencing
• Drainage & fire suppression
Power Infrastructure:
• Substation construction
• Transformer installation
• UPS & backup generators
Container Deployment:
• 3 x 1MW container shells
• Internal racking systems
• Liquid cooling piping (dry)
Commercial Progress:
• 3+ anchor customer contracts
• $15M+ committed revenue
• Partnership agreements

Tranche 3: $41M - Go-Live & Revenue

GPU Procurement & Installation:
• 1,728 NVIDIA GB200 GPUs
• Rack integration & cabling
• Network fabric deployment
Cooling & Operations:
• Liquid cooling system fill
• CDU commissioning
• PUE optimization (<1.10)
Software & Platform:
• Cloud orchestration layer
• Billing & provisioning system
• Security & monitoring tools
Revenue Generation:
• First customer go-live
• $1M+ MRR achieved
• 85%+ utilization target
Scale Preparation:
• Series A fundraising
• 100MW site planning

3MW Container PoC: 6 Months to Revenue
Validates Model for 500MW Scale

Let's Build India's AI Infrastructure Together

📧 ceo@antriksh.cloud

🌐 www.antriksh.cloud

📱 +91 86829 40765 | +1 206 665 0905

Schedule Meeting Learn More

📊 Data Room Available

Detailed financial models, technical specs, government agreements, and more available for serious investors

Building the infrastructure for India's trillion-dollar digital economy